London Borough of Hammersmith & Fulham
Brownfield land
There is a problem
- 15 entries must have valid URIs
LBHF018
- SiteReference
- LBHF018
- SiteNameAddress
- Sotheron Place
- Deliverable
- yes
- HazardousSubstances
- Hectares
- 0.29
- MinNetDwellings
- NetDwellingsRangeFrom
- 31
- NetDwellingsRangeTo
- 31
- OwnershipStatus
- PermissionDate
- PermissionType
- full-planning-permission
- PlanningHistory
- PlanningStatus
- pending-decision
- SiteplanURL
- GeoX
- POINT(-0.189125 51.477726)
- GeoY
- POINT(-0.189125 51.477726)
- Notes
- Demolition of existing buildings and redevelopment including the erection of a part one, part 3 storey building and a 6 storey building plus basement to provide 31 flats (Use Class C3) and commercial floorspace (Use Class B1a and D2) with associated parking, landscaping and amenity space.
- OrganisationLabel
- OrganisationURI
- LastUpdatedDate
- 2021-01-25
- FirstAddedDate
- 2021-01-25
- EndDate
How to fix this issue
Your dataset is missing the PlanningHistory column.
The Brownfield land guidance explains how to fix the issue:
PlanningHistory
Enter links to any web pages that give information on the site’s planning history (include the “http://” or “https://” prefix). Fields in this column can contain more than one link, as long as you separate multiple links with the pipe character (‘|’). You can leave this field blank.
How to improve London Borough of Hammersmith & Fulham’s data
- Fix the errors indicated
- Use the check service to make sure the data meets the standard
- Publish the updated data on the endpoint URL